Global data-center electricity demand in 2030
Projected in the IEA’s 2025 Base Case, more than double the 2024 level.
IEA, Energy and AI (2025)Applications
Data centers, industrial heat, remote and critical sites, and waste consumption. The same 5 MWe unit serves all four, added as the site grows.
Explore the applicationsOne unit. Four applications.
Projected in the IEA’s 2025 Base Case, more than double the 2024 level.
IEA, Energy and AI (2025)In the IEA’s 2025 Announced Pledges Scenario, where announced energy and climate policies are fully met.
IEA, The Path to a New Era for Nuclear Energy (2025)Where it goes to work
Firm on-site power
Firm on-site power in 5 MWe units, up to 100 MWe per campus, with no cooling water and no refueling outages.
Heat above 700 °C
Process heat above 700 °C for hydrogen, chemicals, fertilizer, glass, steel and cement, with power from the same plant.
Diesel replacement
Road-transportable units that replace diesel at mines, islands and defense installations, running for years without an outage.
Recycled actinides as fuel
Fueled with recycled actinides, a fleet consumes the long-lived component of used fuel at the rate it makes power.
A conversation starts here
Developing a campus, a plant, or a remote site? Let’s talk about what it needs.